OM17-P4000VIS-NIR
7-2
Computer crashes or has been hard reset while acquiring data
1. Once computer has restarted open Veris Spectrophotometer Software again.
2. Step through software till clustering has been complete. The cluster program will
generate a map, which will let the user know the last point where data was stored.
Using the map as a guide open the acquisition and begin to store data again. The
acquisition will append the new data to the previous data stored.
Reference check will not pass after several tries or steps are out of range
1. Close out of software
2. Shut down power/ restart power to cases
3. Check the port settings
4. Restart software and run dark/reference again
5. Complete procedure #9,on shutter movement.
Auxiliary data not updating or ports not setting up correctly
1. Shut down power, and restart cases
2. Ensure USB cables are secured tightly
3. Follow the steps outlined in procedure #10, to ensure data is present on the ports.